NWS Holdings Limited
Searching tips: Use quotes to search for phrase.
Example: "NWS Holdings"
We listen Print Browser Site Map 繁體 简体 Text Version Enlarge Font Reduce Font  
About NWS
Our Business
What's New
Investor World
Corporate Governance
Community & Environment
Working at NWS
Resources Centre
 
 
 You are here : Home > Our Business > Infrastructure > Roads
» Infrastructure
Introduction
  Roads
  Energy
  Water
  Ports & Logistics
» Services
 
Our Business - Infrastructure - Roads
 

Roads

RoadsNWS Holdings invests in and operates 17 road projects in Guangdong, Guangxi, Shanxi and Tianjin, one tunnel project in Hong Kong, and one bridge project in Guangdong. Altogether these projects cover a total length of 618 km.

 
Project (in PDF format)
Gross Length
NWS Holdings' attributable interest (%)
Expiry
Location
Guangzhou City Northern Ring Road 22 km 65.29 2023 Guangdong
Beijing-Zhuhai Expressway (Guangzhou-Zhuhai Section) 62.4 km 25 2030 Guangdong
Beijing-Zhuhai Expressway (Guangzhou-Zhuhai Northern Section) 27 km 15 2032 Guangdong
Guangzhou-Zhaoqing Expressway 48 km (Phase I)
6.1 km (Phase II)
25 2031 Guangdong
Guangzhou Dongxin Expressway 46.22 km 40.8 2033 Guangdong
Shenzhen-Huizhou Expressway (Huizhou Section) and Shenzhen-Huizhou Roadway (Huizhou Section) 34.7 km/21.8 km 33.33/50 2027/2023 Guangdong
Guangzhou City Nansha Port Expressway 72.4 km 22.5 2031 Guangdong
Beiliu City Roadways 16.3 km 100 2026 Guangxi
Rongxian Roadways 16.8 km 100 2026 Guangxi
Yulin-Shinan Roadway 27.8 km 65 2026 Guangxi
Yulin Shinan - Dajiangkou Roadway 8.7 km (Phase I)
30 km (Phase II)
60 2026
2024
Guangxi
Roadway No.321 (Wuzhou Section) 8.7 km (Phase I)
4.3 km (Phase II)
52 2022 Guangxi
Shanxi Taiyuan - Gujiao Roadway (Taiyuan Section) 23.18 km 60/90 2025 Shanxi
Shanxi Taiyuan - Gujiao Roadway (Gujiao Section) 36.02 km 60/90 2025 Shanxi
Roadway No.309 (Changzhi Section) 22.2 km 60/90 2023 Shanxi
Taiyuan - Changzhi Roadway (Changzhi Section) 18.3 km 60/90 2023 Shanxi
Tangjin Expressway (Tianjin North Section) 43.4 km (Section I)
17 km (Section II)
90% distributable cash for the first 15 years; 60% distributable cash for the last 15 years 2029 Tianjin
Tate's Cairn Tunnel 4 km 29.5 2018 Hong Kong
Gaoming Bridge 1.1 km 30/80 2021 Guangdong
Guangzhou Chuangyue Transport Electronic Technology N/A 33.3 2037 Guangdong
  © NWS Holdings Limited 2009. All Rights Reserved. [ Disclaimer ] Powered by New World Concepts Co. Ltd.